Member Dipert requested that Director Dotson research the potential replacement of the restroom signs in East Park, specifically the bandshell, since they are faded beyond being legible. Included in attachments are two options:
1. Refresh current signage for $223.20.
2. Replace signs with branded signs to match Wayfinding and other signage in town for $391.63.
Note that the estimate provided includes the restroom sign on the Harbor Master building as well - this is because Recreation Director Kent Knorr had contacted them to replace that sign around the same time I contacted them to give an estimate for the bandshell signs. I have subtracted one unit from that estimate for my total above since that specific sign would be paid for out of the Recreation Department's budget.